Public project records
Application and permit counts are not unique project counts.
| Record / proposal | Companies / published roles | Community | Status as published | Record date | Declared value | Shortlist |
|---|---|---|---|---|---|---|
| TOWNHOUSES - 4 UNIT #1 - INTERIOR ALTERATIONS TO INCLUDE ENSUITE DOOR RELOCATION, BATHTUB TO REPLACE SHOWER, AND REPLACE UPPER LEVEL RAILING WITH A 1/2 WALL BCBC 2024 BP0604121160 BURDETT AVE | APPLICANT | VictoriaFairfield | ACTIVEBuilding permit | Oct 28, 2026Issued | $125,000Municipal permit value | |
| SINGLE FAMIL Y DWELLING THE SCOPE OF WORK IS LIMITED TO STRIP OUT WORK ON THE 2ND LEVEL FOR THE REMOVAL OF .EXISTING . PARTITIONS, MILLWORK, FIXTURES, FLOORING THIS PERMIT DOES NOT INCLUDE ALTERATIONS TO THE STRUCTURE OR STRUCTURAL INTEGRITY OF THE BUILDING, THE OCCUPANCY CLASSIFICATION, MEANS OF EGRESS, OR THE EXTERIOR OF THE BUILDING. ALL ASPECTS RELATED TO LIFE SAFETY, PASSIVE OR ACTIVE FIRE PROTECTION WILL NOT BE DISTURBED, REMOVED OR RENDERED INOPERABLE. THIS INCLUDES GUARDS, FIRE SEPARATIONS, FIRE WALLS, FIRE CLOSURES, FIRE ALARM AND SUPPRESSION SYSTEMS. BCBC 2024 GROUP C BP060474255 GOVERNMENT ST | APPLICANT | VictoriaJames Bay | ACTIVEBuilding permit | Oct 28, 2026Issued | $25,000Municipal permit value | |
| TRIPLEX New Fixture 3 Bathtub; New Fixture 3 Clothes Washer; New Fixture 3 Dishwasher; New Fixture 1 Domestic Water Service; New Fixture 1 Sanitary Pump; New Fixture 1 Sanitary Sewer Connection; New Fixture 2 Shower; New Fixture 5 Sink - Basin/Lavatory; New Fixture 1 Sink - Laundry; New Fixture 3 Sink - Residential Kitchen; New Fixture 1 Storm/Foundation/Site Drainage; New Fixture 5 W.C. - Toilet; New Fixture 3 Water Supply to Fridge; PP0608071012 OLIPHANT AVE | APPLICANT | VictoriaFairfield | ACTIVEBuilding permit | Oct 28, 2026Issued | $40,000Municipal permit value | |
| SALVATION ARMY - COMMERCIAL/RESIDENTIAL New Fixture 1 Shower; New Fixture 2 Sink - Basin/Lavatory; New Fixture 3 Sink - Janitor; New Fixture 2 W.C. - Toilet; PP060808 · 2 locations521 JOHNSON ST; 525 JOHNSON ST | APPLICANT | VictoriaDowntown | ACTIVEBuilding permit | Oct 28, 2026Issued | $690,000Municipal permit value | |
| 2658 VICTOR ST VICTORIA BC V8R 4E2 New Fixture 1 water service line; PP0608092658 VICTOR ST | APPLICANT | VictoriaOaklands | ACTIVEBuilding permit | Oct 28, 2026Issued | $2,500Municipal permit value | |
| Electrical Permit (EP) — EP085925 Scope of work as per Nemetz (S/A) & Associates Ltd Drawings, Project Name: 937 View Street, 15447, Issued for Construction: 2026-09-09 Including but not limited to: 3000kva 12.5kv to 600v delta/wye (25kv rated) outdoor unit substation, 3000amp 600v Main distribution, 500kva Emergency Generator, Fire Pump Connection, Residential suites and common area branch wiring, Lighting, Fire Alarm System, Security/ Access Controls Rough-in, Communications systems, Crest System (Rough-in only) Underground utility ducts, Fire Stopping EP085925937 VIEW ST | Company named on electrical drawings | VictoriaDowntown | ACTIVEBuilding permit | Oct 27, 2026Issued | $7,960,568Municipal permit value | |
| Fire Station #1 Replacement The City of Nanaimo project history records the Fire Station #1 replacement construction award to Kinetic Construction Ltd. on June 26, 2020, with work beginning July 27, 2020. The available owner-page progress history is historical. This record establishes the stated award and project reference; it does not establish a current construction stage or available subcontract. nanaimo-fire-station-one666 Fitzwilliam Street | Awarded construction contractor; award date2020-06-26 — historical award/project role | Nanaimo | Historical construction award — June 26, 2020Capital project report | Not publishedSource report | Not published | |
| University of Victoria Student Housing & Dining Houle’s University of Victoria Student Housing & Dining case study lists completion in 2023 and describes its electrical, security, communications, building-controls and audiovisual scope. Its project details list EllisDon Corporation as contractor. This is a participating company’s description of completed work, not an independently certified outcome, current hiring requirement or available trade contract. Location scope: this is a campus-wide project report. The University’s September 27, 2023 Board docket records District of Saanich full-occupancy approval for the Sngequ House component on August 22, 2023. The Saanich community label refers to that component; it does not place every project building or the whole campus within Saanich. uvic-student-housing-dining-2023 | Contractor as listed in Houle’s project details Electrical, security, communications, building controls and audiovisual solutions — historical/completed project role | Saanich | Completed 2023 — participating contractor case studyCompany project report | Not publishedSource report | Not published |
Most recent source check Oct 29, 2026, 8:43 a.m. PDT. Source dates and change dates are kept separately.